project duration

project duration

 英

  • 网络工期;项目工期项目持续时间;项目实施时间

例句

Furthermore, the project duration is usually specified and the contractor must abide by the deadline for completion.

此外项目工期通常明确规定承包商必须期限完成工程

these latter two types of links automatically overlap tasks , which tends to decrease the overall project duration.

链接类型自动重叠任务趋于缩短项目工期

A technique used to predict project duration by analyzing which sequence of activities has the least amount of scheduling flexibility.

一种用来预测项目工期方法通过分析序列活动使时间安排具灵活性项目工期

This allows you to design large project structures with different phases spread over the project duration cycle.

允许一个长期项目分成多个阶段完成

The increase in project duration normally translates into an increase in the cost of labour as the labour is deployed on daily wages basis.

增加项目期限通常转化增加劳工成本劳工部署工资基础

Cost itself may be a product of other factors, including the project duration, resources, and environment.

费用本身可能产品其它要素包括产品工期资源环境

The objective of fast tracking a project is to: Increase productivity. Reduce project duration. Increase schedule tracking controls.

项目快速跟进目标提高生产效率减少项目历时提高进度跟踪控制降低项目风险

This dissertation aims to increase the understanding on the interactive effects of software project duration, risk factors and performance.

篇论文主要目标探讨软体专案风险因子绩效相互关系

The optimal size of resource is, therefore, defined as the minimum size of resource required to keep the project duration a minimum.

最佳大小资源所以界定最小尺寸资源必须保持项目持续时间减少最低限度

The converged project duration together the crew size used is shown in Table 3.

融合项目期限连同船员尺寸采用3

Total project duration is expected to be completed at the end of 2014.

项目工期预计2014年全部竣工

However, an increase in the size of the plumbing crew reduced the project duration to 229 days.

不过增加大小管道船员减少项目执行229

The project duration increased with the reduction in the size of resources.

项目执行增加减少规模资源

Define tasks that are short compared with the overall project duration.

定义整个项目工期任务

Apply three proven approaches to reduce project duration.

采用行之有效方法缩减项目工期

In exceptional circumstances the commision may allow the project duration to exceed 6 months.

如果情况特殊委员会可以允许工程超过六个

Chapter 5, study the correlation deeply between project duration and cost(time-cost trade-off).

第五项目施工工期费用之间相关性进行深入研究

Project estimates a single project duration based on a weighted average of the three duration values for each task.

Project基于每个任务三个工期加权平均估计单个项目工期

The project duration is initially 30 days but will be extended.

项目为期30最初延长

A Revenue Incentive Model of Project Duration Coordination between Project Corporation and Contractor

基于工期协调项目公司承包商收益激励模型

The Risk Management Decision Model of the Model Project Duration and Adaptive Genetic Algorithm

型号项目工期风险管理决策模型适应遗传算法

Reducing project duration by redefining logical relationships

重新界定逻辑关系缩短项目周期

Incentive Optimization and the Determination of Optimal Project Duration to Multi-contracts

合同激励优化最优工期确定

The Optimization of Income Incentive and the Determination of Optimal Project Duration

收益激励优化最优工期选择

Analysis on the Relation between Risk Factors and Project Duration

风险因素项目工期相关性研究

Research on engineering project duration risk based on fuzzy network

基于模糊网络工程项目工期风险评估研究